• Phone

    86-23-86512033

  • Address

    No. 32-5, Unit 1, Bldg. 1, No. 288, Nancheng Avenue, Economic Development Zone, Chongqing, China (Mainland)

  • E-mail

    k@waimaotong.com

LatestProducts

                            2014 New Toothbrush Production Line/High Speed Toothbrush Making Machine

                            2014 New Toothbrush Production Line/High Speed Toothbrush Making Machine

                            2014 New Toothbrush Production Line/High Speed Toothbrush Making Machine

                            2014 New Toothbrush Production Line/High Speed Toothbrush Making Machine

                            2014 New Toothbrush Production Line/High Speed Toothbrush Making Machine

2014 New Toothbrush Production Line/High Speed Toothbrush Making Machine

2014 New Toothbrush Production Line/High Speed Toothbrush Making Machine,YX,Machinery & Industrial Parts,Machinery,Home Product Making Machinery,Brush Making Machines
INQUIRY PRECISE INQUIRY
Description

Overview
Quick Details
Condition:
New
Application:
for tufting
Automatic Grade:
Automatic
Production Capacity:
850-900holes/minute
Place of Origin:
China (Mainland)
Brand Name:
YX
Model Number:
410
Voltage:
3/380V,50HZ
Power(W):
3000w
Dimension(L*W*H):
1400*1250*1250mm
Weight:
750KGS
Warranty:
1 year
After-sales Service Provided:
Engineers available to service machinery overseas
CNC:
high speed
Packaging & Delivery
Packaging Details
wooden box
size: 1400*1250*1250mm
Delivery Time
about 25-35 days after got the deposit

Specifications

1.2014New Toothbrush Production Line/High Speed Toothbrush Making Machine
2.from cutting machine to CNC tufting machine to tr

    2014 New Toothbrush Production Line/High Speed Toothbrush Making Machine 

 

the toothbrush production line introduce :

 our company can supply the completeset of CNC toothbrush production line.from cutting machine to CNC tufting machine to grinding machine to toothbrush packing machine.

 

Warranty:

The machine and CNC system covered by this quotation is guaranteed for a period of 3 years after shipment against defects in materials and workmanship. Any parts found defective will be replaced free of charge.

 

Quotation validity period:

Prices quoted herein are valid for a period of 25 days from date of issue.

 

Delivery:

45--60days after receiving advance payment.

 

Payment:

T/T 40% down payment,60% before shipment. Before the shipping.plz go to china check and accept the machine. And we will teach you how to use the machine (operative technique).

 

Service:

Customer can send one or two persons to our factory to learn how to operate the machine during the trial run the machine. The training is free of charge but customers have to bear room and board themselves in China. Time:1-2 weeks.

If your company don`t send people go to china(our factory).will making the video to show how to use the machine..

If you require our engineer go to your factory.

We will send one or two persons to customer’s factory to erection and commissioning the machine free of charge but customer has to bear one or two person’s air ticket and room and board. Time: 1-2 week..

 

 

2014 New Toothbrush Production Line/High Speed Toothbrush Making Machine